Invoice 230309-1 - Industrial Metallurgists

Invoice 230309-1

Invoice 230309-1

$2000.00 for 6 hours of engineering time

Client: Custom Industries

Project: Cast Iron Roll Ring Development

Phase 1 for 6 hours of engineering time will be used to do the following:

  1. Meet with you to review the roll ring’s composition, microstructure, and mechanical requirements
  2. Identify the casting method required to produce a roll ring with similar composition, microstructure, and mechanical properties.
  3. Identify potential casting process parameters for testing.
  4. Identify whether post casting heat treatment is needed to meet the microstructure and mechanical properties requirements. If heat treatment is necessary, identify a potential heat treatment.
  5. Meet with you as needed to review information and data.

Why Industrial Metallurgists?

  • Practical, up-to-date content.
  • Metallurgy expertise and 20+ years of experience.
  • Courses designed for non-metallurgists.
  • Training accessible from anywhere with internet access.
  • Engaging content.
  • Convenience. Learn when it suits your schedule.
  • Avoid being overwhelmed with too much information at one time. Set your own pace.

$2000.00
ADD TO CART

Industrial Metallurgists, LLC

Providing metals engineering expertise for failure analysis and forensic investigations of metal components and products.

© 2023 imetllc.com — All rights reserved.

Terms & Conditions